School Centre Kranj - all departments (TSCKR)
vrniti
  • Fizika. Zbirka maturitetnih nalog z rešitvami 2018-2023
    Babič, Vito ...
    Type of material - textbook ; adult, serious
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Državni izpitni center, 2024
    Language - slovenian
    ISBN - 978-961-6899-84-0
    COBISS.SI-ID - 199350787

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Knjižnica
available - outside loan, loan period: 21 days
Call number – location, accession no. ... Copy status
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017342
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017342
available - outside loan, loan period: 21 days
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017340
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017340
available - outside loan, loan period: 21 days
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017337
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017337
available - outside loan, loan period: 21 days
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017339
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017339
available - outside loan, loan period: 21 days
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017345
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017345
on loan - outside loan, due date: 08.10.2025

Expected to be available after: 05.01.2026 (1. in queue)
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017338
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017338
on loan - outside loan, due date: 08.10.2025

Expected to be available after: 05.01.2026 (1. in queue)
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017344
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017344
on loan - outside loan, due date: 04.11.2024

Expected to be available after: 05.01.2026 (1. in queue)
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017343
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017343
on loan - outside loan, due date: 23.10.2024

Expected to be available after: 05.01.2026 (1. in queue)
Knjižnica
0000000053 FIZIKA; 2018-2023
IN: 000017341
Knjižnica
53 FIZIKA; 2018-2023
IN: 000017341
on loan - outside loan, due date: 23.10.2024

Expected to be available after: 05.01.2026 (1. in queue)
loading ...
loading ...
loading ...